New offices of the Engineering Corps at the Naval Base in Cagliari

Client: Ministry Of Defence
Working and construction design for the new offices of the Engineering Corps at the Naval Base in Cagliari

 

The works were carried out in the port of Cagliari within the Naval Base, upon demolition of the existing building. The new build was erected on a ribbed reinforced concrete foundation; the raised structures were built in reinforced masonry in insulating brick blocks and pre-stressed reinforced concrete roofing up to 14m in length, completed with jets of concrete during the works. The project also included the installation of all the electrical, air-conditioning, water and sanitary, fire and gas systems.

Click me

Certifications

Page under construction